This building is a three-storey structure. Accommodation on the ground floor includes a long term tenant with retail, examination rooms, storeroom and toilets. Accommodation on the upper two floors includes offices, a conference room, media closet, kitchen, store room and toilets; additional storage is located under the sloping roof areas.
Frame – a concrete frame is exposed in part of the ground floor.
Floors – reinforced concrete generally, timber on the top floor.
Walls – concrete block or gypsum board on stud framing
Roof – timber framed with boarding and colour coated metal sheeting.
Ceiling – suspended ceiling tiles.
Floor Finish – terrazzo and ceramic tiles on the ground floor; carpet generally on the upper floors with ceramic tiles in the toilets and kitchen.
Wall Finish – plaster on block walls, gypsum board on partitions and paint generally. Two external walls on the middle floor have timber weatherboarding as the external finish.
Doors – aluminium framed glazed to ground floor shop, metal to ground floor entrance to upper floors, timber panel to office area.
Windows – generally aluminium vertical sliders, most with steel security bars.
EXTERNAL WORKS
The entrance canopy and concrete pavers appear to be outside the property line. Gabion baskets prevent erosion by the Castries River.
SERVICES
The property is serviced with mains water, electricity and telephone. There is air conditioning to all areas, that on the ground floor provided by the tenant. There is a 600 gallon plastic water storage tank. Sewage is taken to the public sewer.
Sold as is with tile roofing, custom carpet, fire extinguishers, smoke alarms, security system and coding, air conditioning and built ins.